Ramani's


Pallikaranai , Chennai.


 


.....

 

 

 
  • R.C.C. Slab: Framed Structure with brick Panel Walls plastered and putty finish in all rooms including common area.
  • Flooring - Vetrified Tiles Flooring for all the rooms.
  • Toilets - Ceramic Flooring (matt finish) and dado with wall tiles upto 7’0”. Standard quality C.P.Fittings will be provided with light colour porcelain wares. Wash Basins will be of light colour and toilet tub will be provided in one toilet. Consulation model western closet for toilet and for one toilet counter top wash basin IWC will be provided.
  • Joineries
  • Doors - Main door with Teak Frame & Teak Panels with brass fitting and Inner door with ornamental flush door with polish finish.
  • Windows - U PVC Windows with Plain glass panels.
  • Bathroom Doors - Panelled doors with water proof panels with good quality wooden frames of size 4”x2½”. All joineries will be painted with synthetic enamel.
  • Kitchen - Raised cooking platform with Granite top with S.S.sink with drain board. Glazed Tiles will be provided for a height of 3’ for the length of the Cooking platform. Marble shelves will be provided.
  • Bed Rooms - Wardrobe spaces with R.C.C. Slabs and R.C.C. Lofts.
  • Electrical Wiring - 3 Phase supply with concealed wiring in P.V.C. Conduits with good quality copper Cables with good quality ELCB & good quality modular switches will be provided. Exhaust fan for kitchen, One standby sound proof generator facility for the Common areas & lift with 500 watts power backup for all the flats. Telephone wiring line will be Provided.

 

.....
  • Painting - POP cornices for living & dining room and roller finished plastic emulsion for walls in all rooms finish for common areas. .
  • Water Supply
    (a) Ground water with sufficient depth to give continuous supply of water with over head tank fitted with motor and pump. A sump with motor will be provided in the ground to store corporation water and a separate overhead tank will be provided on the roof facilitate supply only in kitchen.
    .
  • Pathways - Interlocking stones will be provided in common areas and Masonary compound wall with two M.S.Grill Gates.
  • Lift - One number of 5 passenger capacity lifts will be provided.
  • Sanitary - All pipe lines in the toilet will be concealed inside the building.
  • Cable TV - One Connection for individual flats
  • Incidental expenses such as Water, electricity service connection charges will be charged extra.
  • Covered Car Park is at Extra Cost.
  • Promoters reserve the right to make alterations in Elevation as may be necessary, without notice.
 
Payment Schedule

  Initial Payment

15%
  At the time of Basement Completion
25%
  At the time of Ground Floor Roof
8%
  At the time of First Floor Roof
8%
  At the time of Second Floor Roof
8%
  At the time of Third Floor Roof
8%
  At the time of Fourth Floor Roof
8%
  At the time of Internal Plastering
8%
  At the time of Flooring
8%
  On Completion and before handing over
4%
   
NOTE: Stamp duty and Regitration charges and Service Charges for Essential connections (Water, Drainage, Electricity and Property Tax Assessment), Service Tax, Sales Tax and Covered Car Park are at extra cost.