Ramani's Fraser Square

Goods Shed Road, Near Avinashi Road Flyover, Coimbatore - 641 001.
| |
|
 |
..... |
RAMANI REALTORS PVT LIMITED - is one of the leading property developers in Tamilnadu, India. over 3 decades. The Group including its Associate Concern, M/s. Rajmani Builders, has successfully completed more than 3.5 Million Sq.ft of Built-up area has over 2000 satisfied customers in Coimbatore and Chennai.
Ramani's Fraser Square on Good Shed Road, offers both office space and redisidential apartments. A unique highlight of this project is the unmatched locational advantage.
As a vantage location, this project offers a prestigious address for offices and commercial establishments. 3488 Sq.ft. is available in each of the 4 floors.
It also doubles up as an ideal location for residences. Situated close to Avinashi Road fly over and Head Post Office, residents of these apartments will have easy access to the Railway Station, shopping areas and all prime locations in the city. Each floor has three 2 bedroom flats and one 3 bed room flat.
Make your office / home at Ramani' Fraser Square. Be assured of getting value for money from a reliable builder.
|
| |
|
-
R.C.C.
Slab:
Framed Structure with brick Panel Walls plastered and putty finish in all rooms including common area.
-
Flooring - Marble slabs in Hall cum Dining and Marble tiles in Bedrooms and kitchen.
-
Toilets
- Ceramic flooring (matt finish) and dado with glazed
wall tiles upto 7'0". Standard quality C.P. Fittings
will be provided with light colour porcelain wares. Wash
basins will be of light colour. Constallation model western closet, and table
top wash basin will be provided in attached toilet. IWC
will be provided in the common toilet.
-
Joineries
-
Doors
- Main door with teak frame & teak panels with brass
fitting and Inner door with ornamental flush door with polish
finish.
-
Windows
- PVC Vinyl windows with plain glass panels.
-
Bathroom
Doors - Panelled doors with water proof panels with
good quality wooden frames of size 4" X 2 1/2".
All Joineries will be painted with synthetic enamel.
-
Kitchen
- Raised cooking platform with granite top with S.S Sink
with drain board. Glazed tiles will be provided for a height of 3' for the length of the cooking platform.Marble shelves will be provided.
-
Bed
Rooms - Wardrobe spaces with R.C.C Slabs and R.C.C.Lofts.
-
Electrical
Wiring - 3 phase supply with concealed wiring in P.V.C.
Conduits with good quality copper cables with good quality
ELCB & best modular switches will be provided along with electrical fittings wherever necessary.One standby
auto start, sound proof generator facility for the common
areas & lift with 500 watts power backup for each
flat.Telephone wiring line will be provided.
|
..... |
-
Painting
- POP cornices for living & dining rooms and roller finished putty and good quality paint finish for walls in all rooms.
-
Water
Supply
(a) Ground water with sufficient depth
to give continuous supply of water with over head tank
fitted with motor and pump. A sump with motor will be
provided in the ground to store corporation water and
a separate overhead tank will be provided on the roof
to facilitate supply only in kitchen.
(b) Water softening plant will be provided
for the ground water.
-
Pathways
- Interlocking stones will be provided in common areas
and masonary compound wall with two M.S.Grill Gates.
-
Lift
- One number of 5 passenger automatic V3F lifts will be provided.
- Intercom
- Intercom connection will be provided for all the flats.
- Gas Connection - Individual Pipe line gas connections will be provided in kitchen for all the flats.
-
Sanitary ware
- All pipe lines in the toilet will be concealed inside the building.
-
Cable
TV - One Connection for each individual flat.
-
Gardening - Landscaping Garden will be provided in and around the buildings.
|
| |
| Initial
Payment |
15% |
| At
the time of Basement Completion |
25% |
| At
the time of Ground Floor Roof |
8% |
| At
the time of First Floor Roof |
8% |
| At
the time of Second Floor Roof |
8% |
| At
the time of Third Floor Roof |
8% |
| At
the time of Fourth Floor Roof |
8% |
| At
the time of Internal Plastering |
8% |
| At
the time of Flooring |
8% |
| On
Completion and before handing over |
4% |
| |
|
|
NOTE: Stamp duty and Regitration charges and Service Charges for Essential connections (Water, Drainage, Electricity and Property Tax Assessment), Service Tax, Sales Tax and Covered Car Park are at extra cost. |
|
|
| |
|