|
Ramani's Kolapakkam , Chennai.

| |
| |
..... |
The project is located in kolapakkam (near porur) ,a calm residential locality which is surrounded by Schools, Hospitals & I.T parks .It consist of 56 well designed & ventilated 2 BHK deluxe apartments with covered car park in 14 blocks of stilt plus 2 floors in 1 acre of land. The ground water is potable & can be used for cooking as well as drinking purpose.
Distance of major land mark from the project site
1. PSBB Millenium School 1.0 km
2. Omega international school 900 mtrs
3. Pon vidyashram 1.5 kms
4. Holy cross matriculation School 900 mtrs
5. St. Francis International School 1Km
6. Sri Ramachandra Hospital 5.3 km
7. Miot hospital 4.5 kms
7. L & T info tech 4.2 kms
8. DLF IT SEZ 4.7 km
9. Virtusa Tech 8.6 kms
10. Porur Junction 4.1 kms
11.Chennai International Airport 8.5 km
12.Tambaram Sanatorium Railway Station 10.3 km
|
| |
|
-
R.C.C.
Slab:
R.C.C framed structure with fly ash bricks/ brick panel wall plastered with cement mortar.
-
Flooring
- Living, Dining & Bedrooms floorings are laid with vitrified tiles.
-
Toilets
- Toilets & Balconies are laid with ceramic tiles.
-
Joineries
-
Doors
- Main door: Teak wood frames with teak face shutters-Varnished.
Bedroom doors: 30mm thick hardcore flush shutters with good quality frames.
-
Windows
- Aluminium anodized windows
-
Bathroom
Doors - Hardcore flush doors with water resistant paint.
|
..... |
-
Painting
- Internal & external will be painted with emulsion.
-
Pathways
- Pathways/Driveways will be paved with pavement tiles.
-
Sanitary
- Sanitary items of Parryware/Hindware or equivalent.
-
Cable
TV - One Connection for individual flats
- Landscaping will be provided as per architect's design.
- C.P fittings of Metro or equivalent.
|
| |
| Initial
Payment |
15% |
| At
the time of Basement Completion |
25% |
| At
the time of Ground Floor Roof |
8% |
| At
the time of First Floor Roof |
8% |
| At
the time of Second Floor Roof |
8% |
| At
the time of Third Floor Roof |
8% |
| At
the time of Fourth Floor Roof |
8% |
| At
the time of Internal Plastering |
8% |
| At
the time of Flooring |
8% |
| On
Completion and before handing over |
4% |
| |
|
|
NOTE: Stamp duty and Regitration charges and Service Charges for Essential connections (Water, Drainage, Electricity and Property Tax Assessment), Service Tax, Sales Tax and Covered Car Park are at extra cost. |
|
|
| |
|