Ramani's Mayuri - Phase III 4 in 1 Houses


Chinnavedampatti, Coimbatore - 641 006.


 
.....

Ramani's Mayuri, is a project of the company at chinnavedampatti near saravanampatti, the emerging IT hub of Coimbatore city. The Project is spread over an area of 40 acres. Over 400 indipendant houses have been completed and handed over by Phase I&II. The Company now offers 24 affordable 2 bedroom 4in1 houses in Ramani's Mayuri Phase III.

The Project is located close to Sathy Road, National Highway 209. The area which is fully developed with street lights, park and childrens play area has several families residing. It is also covered under the Athikadavu scheme which supplied drinking water. The area has a frequent Bus service. The Project has several inherent advantages. Residents have easy acces to Gandhipuram, The City Centre which is just 8 KM away and to the Airport which is just 12 Kms through the Kalappatti road. Several Prestigious schools, colleges and hospitals in close vicinity mae living easier. The Presence of IT Majors, Cognizant, Robert Bosch, Perot Systems and Ford Business Service Centre (FBSC) close by ensure good rentals and high appreciation.

 
 
  • R.C.C. Slab: Framed Structure with brick Panel Walls plastering in all rooms.
  • Flooring - 2'x2' Virtified Tiles Flooring in all the rooms
  • Toilets - Ceramic flooring (matt finish) and dado with glazed wall tiles upto 7'0". Standard quality C.P. Fittings will be provided with white colour porcelain wares. Wash basins will be of white colour. Constellation model western closet, wash basin will be provided in attached toilet. IWC will be provided in the common toilet.
  • Joineries
  • Doors - Main door padock frame and good quality panels with polish finish and flush door will be provided in bedrooms.
  • Windows - Aluminium powder coated sliding windows with plain glass.
  • Bathroom Doors - Water proof fibre doors will be provided.
  • Kitchen - Raised cooking platform with granite top with S.S Sink with Glazed Tiles will be provided for a height of 3' for the length of the cooking platform.Cuddapa shelves will be provided.
  • Bed Rooms - Wardrobe spaces with R.C.C Lofts and Slabs.
  • Electrical Wiring - 3 phase supply with concealed wiring in P.V.C. Conduits with good quality copper cables with good quality modular switches will be provided. One standby sound proof generator facility for the common areas. Water pumping & lift. Telephone wiring line will be provided.

 

.....
  • Painting - POP for all rooms wall and ceiling with plastic emulsion finish.
  • Water Supply - A sump with motor will be provided in the ground to store water and overhead tank will be provided in terrace.
  • Pathways - Interlocking stones will be provided for Car parking and common area in ground floor.
  • Sanitary ware - All pipe lines in the toilet will be concealed inside the building.
Payment Schedule

  Initial Payment

15%
  At the time of Basement Completion
25%
  At the time of Ground Floor Roof
8%
  At the time of First Floor Roof
8%
  At the time of Second Floor Roof
8%
  At the time of Third Floor Roof
8%
  At the time of Fourth Floor Roof
8%
  At the time of Internal Plastering
8%
  At the time of Flooring
8%
  On Completion and before handing over
4%
   
NOTE: Registration, EB Connection, Water & Property Tax Assesmentwill be charged extra.