Ramani's Sri Krishna


ATT Colony, Behind The Hindu Office, Coimbatore - 641 018.


 

.....

Ramani Realtors Pvt Limited, assures in giving true value for money by offering projects with well developed facilities and royal benefit to its customers.

The Project “Ramani’s Sri Krishna” at ATT Colony, is in the heart of Coimbatore city., situated in an ideal location with close proximity to airport, railway station, bus terminus and business centers. The project is surrounded by day - to - day lifestyle requirements like schools, colleges, banks, hospitals, restaurants, shopping arcades and various entertainment centres ... and anything and everything you need for a comfortable living.

The projects contains 12 Luxurious flats with rich specifications to suit your life styles. It has ground plus four floors with 4 & 3 Bed Room flats. The project is situated in prime and posh locality and will be constructed according to Vasthu.

The lifestyle at Ramani’s Sri Krishna will actually enable you to enjoy your home with the luxuries that will make living even more delightful.

 
  • R.C.C. Slab: Framed structure with Brick Panel walls plastered and ceiling and putty finish in all rooms including common area.
  • Flooring
    Marble Flooring : In living cum Dining, Bed Rooms and Kitchen.
    Wooden Flooring : For Master Bed Room only.
  • Toilets - Ceramic Flooring (matt finish) and dado with glazed tiles upto 7’0”, Jaguar taps or equivalent and standard C.P Fittings will be provided with light colour porceline wares. Wash Basins will be of light colour. Constellation model western closet and table top Wash basin will be provided in the attached toilet. IWC will be provided in the common toilet.
  • Joineries
  • Doors - Main door with teak frame & teak panels with brass fitting and inner door with ornamental flush door with enamel paint.
  • Windows - UPVC coloured vinyl windows with plain glass panels.
  • Bathroom Doors - Water Proof Fibre doors with good quality will be provided.
  • Kitchen - Raised cooking platform with Granite top with S.S.Sink with drain board. Glazed Tiles will be provided for a height of 3’ for the length of the Cooking platform. Granite shelves will be provided.
  • Bed Rooms - Wardrobe spaces with R.C.C. Slabs and R.C.C. Lofts.
  • Electrical Wiring - 3Phase supply with concealed wiring in P.V.C.Conduits with good quality copper cables , ELCB, change over switch and best modular switches will be provided.

    Electrical Fittings will be provided wherever necessary. One standby auto start sound proof generator facility for the common area & lift with 1000 watts power backup for each flat. Telephone wiring line will be provided.
.....
  • Painting - POP Cornices in hall and dining and all other rooms wall and ceiling with putty and good quality paint finish.
  • Water Supply
    (a) Ground water with sufficient depth to give continuous supply of water with over head tank fitted with motor and pump. A sump with motor will be provided in the ground to store corporation water and a separate overhead tank will be provided on the roof to facilitate supply only in kitchen.
    (b) Water softening system will be provided for the ground water.
  • Pathways - Common Area will be paved with Rubber Moulded Interlocking stones.
  • Lift - A 5 Passenger lift with V3F facility will be provided for all the flats.
  • Intercom - Intercom connection will be provided for all the flats.
  • Gas Connection - Pipe line Gas connection will be provided in kitchen for each flats.
  • Sanitary ware - All pipe lines in the toilet will be concealed inside the building.
  • Cable TV - One Connection for each individual flat.
  • Security System - Centralized Security System in the ground floor common entry with CCTV provision.
  • Gym - Air-conditioned gym will be provided.
  • Gardening - Landscaped Garden will be provided.
 
Payment Schedule

  Initial Payment

15%
  At the time of Basement Completion
25%
  At the time of Ground Floor Roof
8%
  At the time of First Floor Roof
8%
  At the time of Second Floor Roof
8%
  At the time of Third Floor Roof
8%
  At the time of Fourth Floor Roof
8%
  At the time of Internal Plastering
8%
  At the time of Flooring
8%
  On Completion and before handing over
4%
   
NOTE: Registration, Essential Connections like (Water, Drainage, Electricity and Property Tax Assessment) Sales Tax and          Covered Car Park are charged at extra Cost.